Basic Situation of Qingshan Pier Construction


  • 建设依据:《浙江省交通厅关于青田港港头港区一期工程初步设计的批复》浙交复【2008】7号。 1. Construction basis: "Reply from Zhejiang Provincial Communications Department on the preliminary design of Qingtian Port Gangtou Port Area Phase I Project" Zhejiang Jiaotongfu [2008] No. 7. It is a key project in Qingtian County.
  • 建设规模:为新建500吨级泊位2个(水工结构兼靠1000吨级)及其配套设施,设计年通过能力36.8万吨。 2. Construction scale: for the construction of two new 500-ton berths (the hydraulic structure also depends on the 1,000-ton berth) and their supporting facilities, the designed annual passing capacity is 368,000 tons.
  • 工程投资:一期码头工程投资为680万。 3. Project investment: The investment for the first phase of the terminal project is 6.8 million. The project construction period is one year and October.
  • 工程建设主要内容:码头采用高桩梁板式结构,码头平台长度148米,宽度12米,码头上部结构采用纵梁+迭合板结构。 4. The main content of the project construction: The pier adopts a high-pile beam-slab structure. The length of the pier platform is 148 meters and the width is 12 meters. The elevation of the quayside is 6.50 meters. The land area is connected to the dock platform by two trestles. The trestles are east-west trestles. The structure adopts a high pile beam and a hollow slab structure, and the pile foundation uses a 800mm bored pile.

Current operation of Castle Peak Terminal

name import Export total
month Wax powder Quartz sand Continuous casting slab Wax powder Quartz sand Continuous casting slab /
October-December 2010 / 3164 2777 10201 / / /
January-September 2011 / 1697 49693 35166 / / /
Subtotal / 4861 52470 45367 / / /
total 573314 5367 total

Prospects and advantages of Castle Peak Terminal 1

  • 青山钢铁目前产量近40万吨。 1. Qingshan Iron & Steel currently produces nearly 400,000 tons.
  • 青山与印尼八星集团成立SMI公司后,在印尼拥有8个矿区,总面积达到47000公顷,今年一期(2号矿区)累计出矿200吨,拥有1号和2号码头(100000吨级)为矿区配套码头。 2. After the establishment of the SMI company by Qingshan and the Indonesian Eight Star Group, it has 8 mining areas in Indonesia with a total area of 47,000 hectares. This year's first phase (No. 2 mining area) has produced 200 tons of mines, with No. 1 and No. 2 terminals (100,000 tons Level) is a supporting dock for the mining area. The terminal yard is 200,000 tons. The second phase (No. 5 mining area) and No. 3 terminal (100,000 tons) are under preparation. After the completion of the preparation, the output will reach 4 million tons.
  • 福建鼎信集团一、二期工程已经建成投产,生产能力达到近60万吨左右。 3. The first and second phases of the Fujian Dingxin Group have been completed and put into operation, with a production capacity of nearly 600,000 tons. In addition, the two terminals (50,000-ton) in Ningde, Fujian have also been basically completed and are expected to be put into use by the end of the year. (Among them, the wharf in Fuding Bay, Fujian Province (1000-ton class) has been put into use)
  • 广州阳江码头(50000吨级)在筹建中,同时世纪青年产5万吨镍合金项目也在筹建中。 4. Guangzhou Yangjiang Wharf (50,000-ton class) is under construction, and Century Century's 50,000-ton nickel alloy project is also under construction. In addition, Guangzhou Qingyuan stainless steel production has reached 400,000 tons.
  • 乐清市乐清湾港区码头(50000吨级)在筹建中。 5. Yueqing Bay Port Terminal (50,000 tons) is under construction. The annual output of Yueqing Bay stainless steel is expected to be 500,000 tons (under construction).